Your ASHRAE 188 Water Management Plan, done before the deadline.
Facility managers, building engineers, and owners responsible for a water management program — senior living and skilled-nursing operators, hospitals and CAHs, hotels, residential high-rises, and any building with a cooling tower or centralized hot water. If you're in New Jersey you must have a written WMP by Sept 12, 2026 and implement it by Dec 12, 2026 (P.L.2024 c.66 / S2188); if you run a NYC cooling tower you face monthly Legionella testing as of May 7, 2026 (LL159). CMS-certified healthcare facilities have needed a WMP since 2017. The choice today is a $2,995/yr software subscription or a free-but-generic government PDF; this pack is the professional-grade middle.
Deadline window is open now
If you own or operate a covered building, these are statutory dates, not soft targets. New Jersey's law is a TWO-deadline structure: the program must be developed and written by September 12, 2026, and fully implemented and operational — baseline testing complete, monitoring logs running, staff trained — by December 12, 2026. Meeting the first date does not satisfy the second. New York City's monthly cooling-tower testing is already in effect.
CMS-certified hospitals, critical access hospitals, and long-term care facilities have needed a documented Legionella water management program since 2017. The surveyor memo (QSO-17-30) expired in September 2025, but the requirement flows straight from the infection-control Conditions of Participation — 42 CFR §§482.42, 483.80, and 485.635 — and surveyors still expect to see the program.
The New Jersey legionella law — P.L.2024 c.66 (S2188) — sets two dates, not one. Hospitals, nursing and assisted-living homes, high-rises with centralized water heaters, hotels of 25+ units, correctional facilities, and any building with a cooling tower, spa, pool, fountain, mister, or humidifier must have the plan developed and in writing by September 12, 2026, and must have it fully implemented and operational by December 12, 2026 — baseline testing done, logs running, staff trained. Writing the plan by the first date does not satisfy the second.
NYC Local Law 159 of 2025 moved cooling-tower Legionella culture testing to at least every 31 days in season, with test dates reported to the Health Department within 5 days. More broadly, ASHRAE 188-2021 applies to essentially any human-occupied commercial, institutional, or multiunit-residential building with a cooling tower or centralized hot water — single-family homes excepted.
Each row is a real obligation, its exact citation (linked to the live source), and the pack document that satisfies it. The seven ASHRAE 188-2021 §6.2 elements are the spine; the CMS, New Jersey, and New York City rows sit on top for the facilities they cover. Note: ANSI/ASHRAE 188-2021 is copyrighted — the pack maps each section to the standard's required elements and cites them, but does not reproduce its normative text. You should hold a licensed copy of the standard.
| Requirement | Citation | Covered by |
|---|---|---|
| Name a water management program team and assign roles/responsibilities for developing and running the program. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Water Management Plan (ASHRAE 188-2021) |
| Describe every building water system and draw process flow diagrams from water entry to each point of use (potable hot/cold, cooling towers, decorative/therapeutic features). | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Water Management Plan (ASHRAE 188-2021) |
| Analyze where hazardous conditions can occur and identify the control locations (control points) in the system. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Water Management Plan (ASHRAE 188-2021) |
| Set control measures with numeric control limits (e.g., temperature, disinfectant residual) at each control location, and define how to monitor them. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Monitoring & Sampling Log Set |
| Define corrective actions and the management (escalation) response taken when a control limit is not met. | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Corrective Action & Management Response Forms |
| Verify the program is being carried out as designed and validate that it actually controls the hazard; document the Legionella-testing decision (§6.2.8). | ANSI/ASHRAE Standard 188-2021, §6 (esp. §6.2) | Annual Program Review & Validation Checklist |
| Cover system-specific requirements — operating manuals, water features, potable and non-potable systems — in the plan's control measures and monitoring. | ANSI/ASHRAE Standard 188-2021, §7 | Water Management Plan (ASHRAE 188-2021) |
| CMS-certified hospitals, critical access hospitals, and long-term care facilities: maintain a documented Legionella water management program under the infection-control Conditions of Participation. | 42 CFR §482.42, §483.80, §485.635(a)(3)(vi) | Water Management Plan (ASHRAE 188-2021) |
| New Jersey covered buildings: DEVELOP the WMP by Sept 12, 2026 and IMPLEMENT it by Dec 12, 2026; post a public notice on premises; retain all records on site ≥ 5 years. | N.J.S.A. 26:1A-140 (P.L.2024, c.66 / S2188), §6 | New Jersey S2188 Compliance Supplement |
| NYC cooling-tower owners: perform Legionella culture testing at least every 31 days in season, report each test date to DOHMH within 5 days, and keep an annually-certified Maintenance Program & Plan. | NYC Local Law 159 of 2025; 24 RCNY Chapter 8 (cooling towers) | New York City LL159 / LL77 Cooling-Tower Supplement |
Each template field maps to the exact section it satisfies — no generic boilerplate, no guesswork about what an inspector expects.
We read the live regulation text (not a summary) and record the source URL and the date we retrieved it, so you can re-check any claim yourself.
Editable DOCX plus print-ready PDF and a plain-English implementation guide. Fill in the merge fields and it's your document, not a locked SaaS record.
The incumbent water-management software (e.g. HC Info LAMPS at ~$2,995/yr) is genuinely good at ongoing hosted monitoring — that's its core value and our Phase 2 logbook is the honest comparison there. But for the document deliverable a covered facility owes an inspector, a recurring subscription is overkill and a free government PDF is under-built. This pack is the empty middle tier.
| What you need | WMPKit | $2,995/yr software | Free CDC/ASHRAE PDF |
|---|---|---|---|
| Price | $399 one-time | $2,995 / year, recurring | Free |
| Built to ASHRAE 188-2021's 7 required elements (§6.2) | Yes — mapped element-by-element | Yes | Structure described, not filled in |
| Editable files you own (DOCX + PDF) | Yes — keep and reuse forever | No — data locked in the subscription | Generic PDF, not tailored |
| NJ S2188 supplement (Sept/Dec 2026 deadlines, notice, retention) | Included | Add-on / consulting | Not included |
| NYC LL159 supplement (31-day testing, 5-day reporting, MPP) | Included | Add-on / consulting | Not included |
| Every requirement cites its exact rule section + source date | Yes — that is the product | Partial | No |
| Ongoing hosted monitoring / automated sampling reminders | No — Phase 2 logbook add-on (roadmap) | Yes — its core value | No |
A one-time purchase, not another subscription. You own the editable files. Give your water-treatment vendor and engineer a complete draft to refine instead of a blank page — then keep the DOCX for every annual review after.
A complete, editable Water Management Plan built to the seven required elements of ANSI/ASHRAE 188-2021 (§6.2), plus the monitoring logs, corrective-action forms, annual-review checklist, and NJ S2188 + NYC LL159 supplements — mapped section-by-section to the standard.
vs $2,995/yr HC Info LAMPS subscription / generic free CDC PDF for the incumbent
Under independent review by a certified water-treatment professional prior to first sale.